In April of this year we invited CMJ to prepare a ‘scheme’ to refurbish the function room at Mere Brow Village Hall.
Kevin Eastham, came and met with the directors, took away some ideas, and then came back with some suggestions, along with a ‘mood board’ which we found very helpful. The mood board was kept on display in the foyer, so our customers could visualise how the room was going to look. Nicky, CMJ’s interior designer, also came up with a good colour scheme, and other good ideas.
At no time did CMJ try to sell us items we did not need or want.
Work began on time in August, and involved a complete rip out of the existing bar. The two joiners who undertook most of the work were very polite, and helpful, as was the flooring contractor.
The bar and the flooring look great and we are really pleased with all the work they have done.
We are so pleased with the work, that we have already asked CMJ to come up with a scheme for our other room the Runner Plat Bar, our Games Room.
We have no hesitation in recommending CMJ to you, and hope you are as pleased with their work as we are.